Complex projects within Combined Cycle Plants
Challenge
Our client was having difficulties building its engineering team for a project concerning the construction of two combined cycle plants. They required support in HVAC engineering and cost control.
Solution
KLB deployed a local team of engineers to implement cost controlling measures and carry out the basic and detailed engineering of HVAC systems. Tasks included:
- Design development for HVAC (Heating Ventilation Air Conditioning) systems
- Review of project specifications, data sheets and specifications of purchase
- Calculation, selection and specification of different types of equipment required for the installation
- Periodic construction site visits for surveys and on site project follow ups
RESULTS
-
The 2 plants were successfully built, each producing over 750 MW of electricity